2013年7月30日星期二

How cone crusher for crushing regular repairs

When customers buy crushing cone break after some use, it will cone crusher manufacturer for crushing more concerned about maintenance, general maintenance cycle should be determined

according to the actual situation to develop the device can be broadly defined as overhaul, repair, minor repairs.

Overhaul about once every four years or decisions based on the actual situation, which includes:
A repair or replacement of the rack and the fundamental part of the problem;
Second, all the items in the repair inspection and processing, as well as technological innovation;
Third, replace the motor stator coil (determined according to preventive tests) and varnished; according to actual situation to decide whether to replace the rotor shaft

In the repair cycle of about 4 to 6 months, and its main contents include:
One, the replacement liner;
Second, the repair or replacement of the eccentric sleeve, and the sleeve straight sets;
Third, the repair or replacement of tiles and dust bowl-shaped device;
Fourth, the repair or replacement of bevel gear, shaft and bearing;
Five, repair adjustment ring and the bearing sleeve thread;
Six, all for a small repair project examination and treatment;
Seven, decomposition motors, blowing dust screen machinery cleaning and inspection departments bearing clearance; decompose oil switch, cleaning and processing defects; ministries electrical

adjustment and testing; checking and repairing power strips and other cable lines.

Small repair cycle once every two weeks to a month, which includes:
First, check the bowl watts;
Second, check the sleeve and straight sleeve for wear and check the gap.
Third, check the bevel gear meshing clearance;
Fourth, check the drive shaft tile gap;
Fifth, check the hydraulic device (such as the absence of a hydraulic device) or replace the lubricant and lubrication equipment;

没有评论:

发表评论