2013年7月31日星期三

Jaw crusher working principle and characteristics

Jaw Crusher Working Principle: The structure of jaw crusher main frame, eccentric shaft, big pulley, flywheel, movable jaw, side guard, elbow board, elbow board seat, adjusting

screw gap, the reset spring, fixed jaw jaw plate and activities, etc., which also play a role as insurance bracket. The Department

Column jaw crusher for the song moving extrusion type, motor-driven belt and pulley, through the eccentric shaft to move the jaw up and down movement, when the movable jaw rises

between toggle plate and moving jaw angle becomes larger, thus promoting the movable jaw plate close to the fixed jaw mobile screening plant plate, while the material is squeezed, rubbing, grinding

and other

Heavy broken; when moving jaw down, the toggle plate and moving jaw angle between, moving jaw plate lever action of the spring to leave the fixed jaw plate, then the crushed

material from the crushing chamber under the discharge port, with the motor jaw crusher motor for continuous rotation of the crushing and nesting periodicity, to achieve mass

production

. Jaw Crusher Features: 1. Crushing chamber crushing plant depth and no dead zone, increased feed capacity and output; 2. Their crushing ratio, uniform particle size; 3. Gasket nesting

population adjustment device, reliable and easy to adjust range, increase the flexibility of the equipment; 4. Lubrication System security

Reliable, easy to replace parts, maintenance workload is small; 5 simple structure, reliable operation, low operating costs. 6 energy-saving equipment: stand-alone energy-saving

15% to 30%, saving more than double the system; 7 nesting population adjustment range, to meet the requirements of different users; 8 low noise, less dust

Jaw Crusher Structure Overview

1, the fixed body: the main components of the fixed body machines, machinery manufacturing process consists of two kinds; carbon steel casting and carbon steel welded steel

chassis frame. Welded rack rack is in the original cast on the basis of an increase of more than gluten, and through strict quality control and the specific process requirements

, To use the same rack with the casting results. To prevent the rack sidewall badly worn around the crusher chamber is Feeding equipment equipped with a shield wall, can easily be replaced.

2, the rotating body: the movable jaw, eccentric shaft, bearings, pulleys and several other components, is the torque transmission and bear a major part.

a, movable jaw: the movable jaw jaw holder and composition of active components, movable jaw stent using 35 # steel, and after quenching and tempering.

b, Bearings: Double row radial spherical roller bearings, and has fine-tuned with a large force, and durable.

c, eccentric shaft: 45 # steel car by the system and after quenching and tempering.

d, jaw plate: Fixed two kinds of activities and to improve the crushing effect, optimized tooth surface, the material used ZGMN13 with high hardness, wear resistance, with

favorable characteristics.

3, the adjustment device: change device is used to adjust the size of the nesting population size, control the Linear vibrating screen particle size. Crusher adjustment mechanism in two forms: improved

DMC-block and plunger gasket type, easy to adjust and flexible, able to achieve stepless adjustment.

4, the safety device: transmit forces outside brackets except major plays role as insurance, that is, when non-broken material into the crushing chamber, the first bracket may

break or bend, thus protecting other machine components.

2013年7月30日星期二

Cone crusher installation and troubleshooting


Installation and commissioning
1.1 machine installed after delivery by the manufacturer, the user should be checked after receipt of the machine and the elimination of transportation for a variety of

problems, and then install it.
1.2 when installing the rack bottom plane of the longitudinal level of tolerance for the 0.5mm / m, horizontal level degrees (measured on the spindle) tolerance of 0.15 mm / m.
1.3 parts upper rack of the rack leveling alignment and tighten the bolt back too for assembly.
1.4 Before starting the machine must be fully checked. Fixed fastening parts, as well as various parts of the lubrication degree V-belt tension, etc. should be checked whether

proper focus.
1.5 examination shall be cut off the circuit switch, and the switch to hang an obvious sign. Marked "not closing" and so forth.
1.6 crusher must load start, no-load commissioning of not less than two hours, turn the trial should observe crusher manufacturer working conditions, such as an abnormal phenomenon

discovered immediately stop and identify its causes; until after elimination the machine can be restarted.
1.7 Application ore feeder evenly fed into the crusher crushing chamber. Start load test should give a small amount of ore, gradual transition to half load, full load. If you

give into the crusher ore ore block is too large or too much, or frequently fall into non-broken (slug) will speed up the machine

The wear and damage. Hence, the control bulk ores and non-broken inside the casing and maintain uniformity to mine the normal operation of the crusher has an important

significance.
1.8 crusher work to maintain the stability of the bearing temperature must not exceed 75 ℃, such as more than should be immediately stopped to troubleshooting.
1.9 crusher parking, you should first cut off the feeder feeding. Subject ore crushing chamber is completely broken, and then cut off the main power to the motor stops.
1.10 Centralized lubrication oil supply system (some models). Consists of a manual dry petrol stations, two to the oil and lubrication piping components. Calcium-based grease

lubricant recommended (GB491-65). Such as the use of sodium based grease (GB492-77), the attention to moisture. Users also have according to their

Conditions of use on behalf of body oil. To the oil, pay attention to toggle plate support surface oil. Users can also be used to bearing oil gun oil filling hole directly. Not

too much, in order to avoid waste. Users can adjust itself to the oil lubrication system, in order to achieve a reasonable oiling purposes.
1.11 crusher discharge opening can be adjusted according to the instructions provided, the user may need granularity and work wear of the tooth plate, at any time after changing

the number of spacers inside the bracket in order to adjust the port of discharge with satisfactory granularity purposes.
1.12 jaw crushing plant optimized in order to do Pai mine mouth easy to adjust, simple, safe and reliable, from the top of the machine and the machine component hydraulic adjustment

device manual pump. After adjusting the port of discharge, simply open the sealing cap on the rear seat, the manual pump connector and from the top machine on,

Start pump to insert or remove shims to adjust the port of discharge to the desired opening, after adjustment shims aid only when the parallel bars of equal length into two tabs

two openings that can be. (Note that the above operations shall be released under the premise of the locking spring

Proceed. ) Another method of direct rotary screw adjustment.
1.13 To make personal safety equipment and accident, the user should develop the necessary safety procedures.
1.14 machine with electronic control devices, see the operation manual electrical control principle

First, the rational use of equipment
1, in order to ensure the product size, must be based on the degree of wear plate umbrella, adjusting row mine clearance.
2, due to the existence umbrella plate surface processing errors and often mixed with iron ore and other foreign matter, in order to ensure safe operation and avoid movable

plates collide with stationary umbrella, Ф1200 crusher discharge opening gap of not less than 25 mm, Ф1650 broken machine not less than 5mm.
3, the device is overloaded, for example: feed particle size is too large, too small or port of discharge any expansion of the feed vent.
4, the maximum size for the ore to the mine mouth should be 80-85%.
5, the action of the spring is when the non-broken materials (iron, metal, etc.) into the crushing space to protect the crusher purposes.
Second, the preparation and examination before operation
1, lubrication part
(1) Check the fuel tank has enough oil, oil meets the requirements, filtering equipment is clean.
(2) test drive pump, check the pump and piping oil leakage and failure.
(3) whether the 0.5-1.2kg/cm2 between hydraulic.
(4) check whether the situation back to the oil flow, oil flow is stable.
2, the body part
(1) based on whether there is loosening the screws.
(2) Adjust the wedge ring and pin piles whether there is loosening.
(3) on the wheel screws are loose, apron damage.
(4) umbrella plate is loose or badly worn.
(5) whether the crusher cavity sandwiched ores or other foreign matter, if any, must be removed in order to drive.
3, the spring portion
(A) whether the spring break, spring screws are broken or badly worn.
(2) the amount of compression spring is in compliance with regulations.
(3) The amount of compression spring in each group are the same.
4, electrical parts
(1) Check the motor graphite brushes in contact situations.
(2) Check the ammeter pointer is in the zero position.
Three methods of operation
(A) driving method
1, check the contents before operation must be itemized checks.
2, starting Dust Blower or dust facilities, starting belt.
3, first press the pump button to start the pump and after the re-start when the oil return normal cone crusher.
4, press the start button to start the crusher, while paying attention to the situation of the swing meter pointer, and not to exceed the rated current of 1.2 times, and pay

attention to the motor and the crusher sound, if an exception should be immediately stopped and checked.
5, the device start operating normally 3-5 minutes after that, you can start a small amount to the mine, and gradually achieve full load.
6, by the fall of the ore hopper mine ore on the disc must remain uniform.
(Two) stop operation method
1, the device stop, must first stop to the mining, ore processing to be completed crusher cavity before parking.
2, press the stop button to stop.
3, press the stop button pump, oil pump stops.
4, stop dust blower or dust removal equipment.
(Three) operation monitoring
1, the operation must be observed voltage, current, oil pressure situation is normal, and timely and accurate records.
2, the device sound is normal functioning ministries, bevel gears should have a strong voice and periodic noise.
3, pay attention to check bearings, motors and other temperature is normal.
Fourth, emergency stop and handling
(A) The following conditions should be found in the emergency stop
1, the motor overload current exceeds the rating, but the machine simply by crushing things.
2, the motor smoke, sparks.
3, the oil temperature abrupt rise back to the oil exceed 60 ℃, oil pressure is not high.
4, non-broken stuck, spring break.
5, the machine another (such as broken walls, rolling acetabular wall, sub-ore disc) rupture.
(Two) high oil temperature, should be idle for some time, increasing fuel, and then stop treatment.
(Three) stop treatment methods handled by parking.
1, dust control system does not work shall not be running.
2, the winter parking two hours or more, must be prevented from freezing oil tank and prevent measures are as follows:
(1) Regular idling, idling every hour 10 minutes.
(2) start the electric heating device to maintain the oil temperature at about 25 ℃.
3, is strictly prohibited due to low oil pressure while removing electrical interlocks.
4, winter needs the oil is heated to above 20 ℃ before driving.
5, rock breaking machine with a load due to power failure or malfunction of a sudden stop when the clip should be cleared ore crushing cavity, so that normal

How cone crusher for crushing regular repairs

When customers buy crushing cone break after some use, it will cone crusher manufacturer for crushing more concerned about maintenance, general maintenance cycle should be determined

according to the actual situation to develop the device can be broadly defined as overhaul, repair, minor repairs.

Overhaul about once every four years or decisions based on the actual situation, which includes:
A repair or replacement of the rack and the fundamental part of the problem;
Second, all the items in the repair inspection and processing, as well as technological innovation;
Third, replace the motor stator coil (determined according to preventive tests) and varnished; according to actual situation to decide whether to replace the rotor shaft

In the repair cycle of about 4 to 6 months, and its main contents include:
One, the replacement liner;
Second, the repair or replacement of the eccentric sleeve, and the sleeve straight sets;
Third, the repair or replacement of tiles and dust bowl-shaped device;
Fourth, the repair or replacement of bevel gear, shaft and bearing;
Five, repair adjustment ring and the bearing sleeve thread;
Six, all for a small repair project examination and treatment;
Seven, decomposition motors, blowing dust screen machinery cleaning and inspection departments bearing clearance; decompose oil switch, cleaning and processing defects; ministries electrical

adjustment and testing; checking and repairing power strips and other cable lines.

Small repair cycle once every two weeks to a month, which includes:
First, check the bowl watts;
Second, check the sleeve and straight sleeve for wear and check the gap.
Third, check the bevel gear meshing clearance;
Fourth, check the drive shaft tile gap;
Fifth, check the hydraulic device (such as the absence of a hydraulic device) or replace the lubricant and lubrication equipment;

2013年7月29日星期一

The strength and fragility of the material introduced



The general performance of the material crushing strength of the degree of difficulty, also known as the fragility of the material. The same crusher crushed under the same

operating conditions of different materials, the production capacity is different, indicating that a variety of materials different friability.

Friability and the material strength, hardness, density, uniformity of the structure, water content, viscosity, cracks, surface condition and the shape factors.

Material strength and hardness are expressed resistance to external force, the strength and hardness of the material is difficult to Grand broken. But the mere hardness of the

material is not necessarily hard to broken, because the material is a block broken split open, so the crusher manufacturer difficulty determining factor is the material strength. The

hardness of the material must be very difficult grinding, crushing process because the grinding process and the different mill grinding process is the body of the material

surface constantly working to generate a large number of fine grinding process, therefore I decided to ease grinding factor is the material hardness.

Uneven nature of the natural material, the same material measured intensity data vary greatly. Therefore, in practical work often measured hardness of the material, the hardness

of the material to some extent reflects the ease of stone screening machine the material, the hardness of the material so that their common friability.

Hammer crusher maintenance and adjustment




Hammer crusher main working parts with a hammer (also known as the hammer) of the rotor. Rotor from the spindle, disk, pin and hammer. Working principle is motor driven rotor

rotating at high speed in the crushing cavity. Material from the upper mouth to feed into the machine, by the high velocity of the hammer blow and grinding. The lower part of

the rotor, with sieve, mesh size is less than crushing the grain discharged through the sieve, sieve size larger than the coarse sieve retention continue to be a hammer blow,

and finally discharged through the sieve machine outside. Only by understanding the hammer Mobile crushing plant works, in order to better safeguard hammer crusher.


One, hammer crusher, such as the coupling of the elastic sleeve damage is found, should be replaced.
Second, the product size can be adjusted by changing the sieve styles or sieve sieve rack mounted on the ends of the tank filler block embedded in order to change the screen of

the gap.
Third, the product adjusting the particle size can be adjusted by rotating the eccentric shaft to the hammer and the gap between the sieve.
Fourth, hammer crusher work, if a sudden strong vibration, should be immediately stopped, identify the cause and eliminate, and then start hammer crusher.
Five, hammer crusher hammer hit some wear and tear on one side, the other side can be reversed using.
VI hammer assembly or replacement, the balance of the rotor must be maintained. Each row of the shaft of the hammer hammer should correspond to the total mass of the hammer axis

equal to the total mass of the hammer, the total deviation must not exceed 1 00g. Quality single hammer little deviation ± 0.5kg.

Hammer crusher is suitable for crushing brittle, medium-hard, surface water does not exceed 2%, not more than 1 50MPa compressive strength of the various materials used in coal,

metallurgy, building materials, chemicals, electricity and other departments breaking or coal crushing plant, coal gangue, limestone, shale, feldspar, gypsum, coke, brick, brown iron

ore, gravel, salt and sulfur, phosphate rock and so on.

2013年7月28日星期日

Jaw Crusher Usage and parameter description





Jaw crusher jaw broken short, jaw crusher with crushing ratio, even granularity, simple structure, reliable operation, easy maintenance, operating costs and economic

characteristics.
Jaw Crusher Application: This series of jaw crusher is mainly used in metallurgy, mining, chemical, cement, Feeding equipment construction, refractories and ceramics and other industrial sectors

for medium pieces and crushing of hard ores and rocks with.
Jaw Crusher Working Principle: the structure of the jaw crusher main frame, eccentric shaft, big pulley, flywheel, moving jaw, side guard, elbow board, elbow board seat,

adjusting screw, returning spring, fixed jaw plate and the movable jaw plate and other components, which is an important device bracket Insurance Parts

.
 This series of jaw crusher for the song moving extrusion type, motor-driven belt and pulley, through the eccentric shaft to move the jaw up and down movement, when the movable

jaw rises between toggle plate and moving jaw angle becomes larger, thus promoting the movable jaw plate close to the fixed jaw plate, while the material is squeezed, rubbing,

grinding

Such as multiple broken; when the movable jaw down, the toggle plate and moving jaw angle between, moving jaw plate lever action of the spring to leave the fixed jaw plate, then

the crushed material from the crushing chamber under the discharge port, with the mobile jaw crusher motor for continuous rotation of the crushing and nesting periodicity, to

achieve continuous

Production.
  Jaw Crusher Features:
1 crushing chamber depth and no dead zone, increased feed capacity and output;
(2) The crushing ratio, uniform particle size;
3 Gasketed nesting population adjustment device, reliable and convenient, adjustment range, increase the flexibility of the equipment;
4 Lubrication system safe and reliable, easy to replace parts, equipment maintenance is simple;
5 simple structure, reliable operation, low operating costs.
6 energy-saving equipment: stand-alone energy-saving 15% to 30%, saving more than double the system;
7 nesting population adjustment range, to meet the requirements of different users;
8 low noise, less dust.

Jaw crusher main components

1 rack

Opening the upper and lower walls of the rack rigid frame, for supporting the eccentric shaft and subjected to the reaction force of broken material, require sufficient strength

and rigidity, the general overall cast steel, cast iron minicomputer can also be used instead of high-quality steel. Mainframe Rack need segmented cast, and then bolt

Strong links into a whole, the casting sieving machine process complicated. Homemade small jaw crusher frame welded thick steel plate can also be used, but the stiffness is poor.

2 jaw crusher jaw plate and side guard plate

By the fixed jaw and movable jaw jaw jaw bed and plates, jaw plate is work regardless, fixed with bolts and wedge in the jaw bed. The bed is the fixed jaw jaw rack wall, moving

jaw jaw hanging in bed week, have sufficient strength and rigidity to withstand the China Vibrating Screen reaction force, which is mostly cast steel or cast iron

.

3 jaw crusher transmission parts

Crusher eccentric shaft axis, by a huge bending torque, high-carbon steel. Eccentric part shall be finishing, heat treatment, bearing liner with babbitt pouring. Eccentric shaft

pulley mounted at one end, a second end attached the flywheel.

4 jaw crusher adjustment device

There are wedge adjustment device, plate and hydraulic, etc., generally wedge, wedge composed by the front two, the former wedge can be moved back and forth, withstood push

plate; wedge after wedge is adjustable, up and down moving backward inclined two wedge bonding, by the screw is moved up and down the rear wedge

Adjusting the size of the discharge port. Small jaw crusher discharge port after the adjustment is to use the change in the thrust plate bearing shims between the rack number to

achieve.

5 Jaw Crusher Flywheel

Jaw crusher jaw flywheel to store energy during air travel, and then used in industrial form, so that the mechanical work is in line uniformly. Also plays a role in the flywheel

pulley. Flywheel often cast iron or steel manufacturing, minicomputer often made integral flywheel. Flywheel manufacture, installation to

Note that static balance.

6 jaw crusher lubrication device

Eccentric shaft bearings are usually centralized lubrication. Mandrels and thrust plate support surface generally use the grease gun oil to the oil by hand. Moving jaw swing

angle is small, between the spindle and bearing lubrication difficulties, often open several axial bearing oil groove bottom, middle to open a ring connected to the tank to make

it

Pass, and then forcibly injected dry butter oil pump lubrication.

2013年7月26日星期五

Tiger population Crusher




"Tiger mouth" is commonly known as jaw crusher, mining crushing process is the necessary equipment, it means that the tiger's mouth, put all of the ore shipped swallowed whole;

crushed ore beneficiation process in the first beneficiation production process, from underground mine shipped ore, hard as stone, as big as mill

Plate, do not crush them shrink twenty or thirty times, is not normally enter the grinding and flotation operations, which depends on the job crushing the divinity of the tiger

population. Broken someone suitable, crushing and screening plant was adequate, grinding load easily, large capacity, production targets and stability, power consumption, materials consumption are

reduced;

Crushing was inappropriate, grinding load increased, not only increased power consumption, processing indicators, let alone the cost of consumption. So beneficiation indicators

crushing is the premise. This depends on this "tiger mouth" was.
The advantage of a small power consumption, high efficiency, energy saving to the user, reduce costs. It is widely used in metallurgy, building materials, chemicals, coal and

other industrial sectors, for Mohs hardness of 7 or less variety of materials, coarse, medium, fine, when used vibrating screen manufacturers crushing, should use energy-efficient crushing jaw broken

Crusher. Suitable materials are pyrite ore, phosphate rock, heavy mineral crystal, lapis lazuli, calcium carbide, coke, limestone, etc., not for tablets ore crushing.

Scrap crusher line selection




Scrap iron and steel production, consumption generated from renewable raw material resources. Scrap iron and steel production as the necessary resources, is the only alternative

to iron ore raw materials. In addition, a carrier can scrap or raw materials. Recycling one ton of scrap steel, steel can be about 0.8 tons, saving the equivalent of two iron

ore

Tons to 3 tons, saving one ton of coke, waste gas, waste water, waste emissions can be reduced by 86%, 76% and 97% in favor of cleaner production and waste discharge reduction.

With the Chinese steel industry development and further implementation of sustainable development policies, scrap consumption will increase year by year, the market will scrap

Growing.

   Countries in the world scrap coal crushing plant mainly by host power lines to distinguish models, host of different sizes, the corresponding model is also different. Scrap crusher

mainframe power line size long struggle, but the power line has been host crusher broken scrap

Crusher trends. Host crusher power lines into a larger one, but its energy consumption is low, strong production capacity, long life, subsequent profits are considerable, for

medium and large yard use. Host crusher small power lines once investment is relatively modest, but the raw

Production capacity in general, profit is moderate, not brands of crushers life is not the same, suitable for small yard use.

Our scrap crusher manufacturing started relatively late, personnel training and a serious shortage of talent pool, independent research and development capabilities are limited.

There are only a few manufacturers can mimic foreign technology, the production of small Linear vibrating screen lines.

2013年7月25日星期四

Roll crusher maintenance points




Roll crusher in operation require regular maintenance on the roll surface. Smooth roll crusher grinding wheel mounted on the rack sometimes, when the roll surface grind pits or

grooves, it can not be removed while the roll surface on the machine on the roll surface grinding repaired. Tooth double roller crusher plate or ring gear teeth are

To replace or turn around and use. When the tooth worn to a certain extent, must be replaced or repaired, or shatter uniform product size, power consumption increases, fall in

production. Some of the machines is also equipped with welding device can be carried out directly on the machine repaired. Some smooth roll break

Crusher with automatic roller axial reciprocating movement device, so that the roll surface wear uniform.
    Roll surface wear, the discharge opening width increases, the need for active roll adjustment (single mobile screening plant is adjustable jaw). Adjustment to keep the two rollers

parallel to each other, to prevent distortion, mechanical sliding bearings roll crusher, roller-breaking should be noted that the inter-roller-

Clearance. Roller bearing and journal journal diameter tip clearance is usually about 1/10000 ~ 1.5/10000, bearing clearance is the top side of the gap is 1/2 to 1/3.

Shaker Overview




Shaker generally vibrator, screen box, vibration isolation devices, drives and other components. Shaker with a rectangular screen surface, installed in the sieve box. Screen box

and the screen surface under the action of the vibrator, producing a circular, oval or linear trajectory vibrations. Since the vibration sieve screen surface so

Layer of loose material on the screen surface Sand screening machine and toss away, so that fine particles can fall through the material layer and is discharged through the sieve and sieve the

particles stuck in the vibration out, in addition to generating screening effect, and causes the material to before movement.


The inertia of a circular trajectory is circular vibrating screen machine vibrating screen vibrating screen, called round vibrating screen. This inertia, also known as single-axis shaker shaker,


Vibrating Screen circular trajectory for various screening operations. Because of the circular vibrating sieve surface trajectory, so that screen surface material constantly

flip and loose, so round vibrating screen has the following characteristics:
    1. Fine grade have the opportunity to move to the lower part of the material layer, and discharged through the sieve;
    2. Stuck in the material can jump out of the sieve, sieve to prevent blockage;
    3. High screening efficiency;
    4. Screen angle may be changed, thereby changing the material along the screen surface velocity, improving the handling capacity of the sieve;
    5. For difficult materials can make the counter-spindle turning, so that the vibration direction of movement in the opposite direction with the material, the material along

the screen surface movement speed is reduced (in the sieve surface inclination and spindle speed under the same circumstances) in order to improve screening efficiency.

2013年7月24日星期三

Old steel lifting device driven by Progress Broken Steel





Shirring equipment, mainly for handling of heavy scrap and large components, to reach a certain size and weight, ease into the furnace, then the appropriate sorting can complete

separation equipment, to achieve the purpose of removing foreign purification products; crushing equipment to handle unsorted mixed

Low-quality scrap and subsequently generally equipped with advanced magnetic separation and sorting equipment, to remove foreign material purification products as well as the

purpose of increasing the scrap heap Ratio After the above processing equipment, mainly to achieve increased density decreases and the residue purified granularity Objective To

compare the three types of scrap processing equipment, phase

For scrap crushing machine for the processing of many kinds, high productivity, to remove debris, if accompanied by an appropriate sorting equipment can even mixed in the steel

scrap sorting out non-ferrous metals harmful to obtain very pure high black metal raw materials and thus, scrap Semi-mobile crushing plant production line is the target

Former world light on the ideal scrap processing equipment.

Scrap crushing production line will be thin metal scrap (such as used car body) broken into small pieces to facilitate sorting, get pure black metal raw materials through scrap

crushing production line processing of scrap is clean quality scrap its natural bulk density of 1.2 1.7t/m3,

Is ideal for steelmaking charge in the steel smelting, has the following advantages: (1) high metal yield, ie refining molten steel scrap and increased the proportion of

investment; (2) the chemical composition of each heat stable, non-ferrous metal and non-metallic material has been sorted, so the molten steel containing parathion

Was reduced; (3) mixed with other charge when feeding, crushing material can be filled gaps, improve feeding density, thereby reducing the number of reduced electrode breakage

plus furnace, the furnace is heated evenly and prolong the refractory lining life, reduce air pollution and slag.

Scrap crushing production line process scrap crushing production line process, as shown by the flattening or packaged processed scrap raw materials, through slat conveyor

transported to the feed ramp, feed ramp rotatably mounted on one high and one low two a rolling drum to be squashed and broken to give as gifts

Inner coal crusher machine with a fixed disc on the spindle and a set of security can swing freely between the disc of the hammer, the kinetic energy generated by the high-speed

rotation, such as the tear drop scrap crushing treatment for the steel scrap into blocks or lumps, and through the bottom or the top of the grid,

Fall in the vibrating conveyor, automatic control and man-machine interface operation.

Soft-type material crushing device's default




The whole structure and technical parameters based on solid fuel biomass pretreatment requirements, as well as research proposed cutting crushing principle, and after the design

of the main working parts and a lot of banana screen test to determine the wood-based biomass feedstock grinder, machine structure as shown. Agriculture

The machine can be applied to the whole class grinder high waxy, long fiber, high degree of lignification of cotton stalks, sunflower stalks and twigs and other biomass

materials crushing, wide adaptability, able to meet the biomass solid fuels forming requirements.

Where L1, L2 respectively, across the cutterhead cutting blade distance from the center, α is the angle between the two cutting blades. Cutter cutting, crushing unit and fan

installed on the same spindle, so the spindle speed for cutting, grinding have a great impact. This machine is calculated based on productivity

Spindle speed: zlrQn × = 260π (1) where, n is the spindle speed; Q is productivity, m3 / h; r the radius of the cutting material, m; l is the average length of the pulverized

material, m; z for the knife on the disc cutter number.

In the design of this mill productivity 2 ~ 3m3 / h, the maximum diameter of the cutting material is less than 15cm, the length of the crusher machine material 5 ~ 15mm, an average of

10mm, the cutting blade on the cutter number 5, so into Equation (1) to obtain the spindle speed of 850r/min. but

The mill is not only mounted on the spindle of the cutting knives, and the installation crushing hammer, the role of the hammer after cutting by the cutting blade thin strip of

material is further crushed, therefore requiring a higher speed to improve productivity, to ensure cutting, grinding effects, taking into account the spindle speed

To 1250r/min.

Notes: 1. Cutter disc 2. Cutting knives, L1, L2 respectively, the cutting blade on the cutter across the distance from the center, α is the angle between the two units of the

cutting blade is cutting force per unit length on the cutting edge of the knife cutting force , which is the most basic parameters of wood cutting, affecting short sliced ​​piece

unit cutting machine

Force main factors: species, wedge angle and cutting knife protruding amount of the cutter installation diagram, where δ is the wedge angle cutters, γ is the cutting knife and

the angle between the cutter, ε is cutting edge port the gap between the knife and the bottom.

Other component 1) pulverizing device is after cutting material into the crushing device, and then further pulverized to meet the requirements. In the pulverization apparatus,

the installation of four hammers, showing twenty-two symmetrically, each mounted hammer 3 to 4, the ends of each hammer processed into a trapezoid, which increases

The edge of the hammer, and each hammer are the blade, and enhance the crushing effect. Hammer parameters: length 235mm, width 50mm, thickness 8mm.2) is installed on the bottom

shell casing beside knives and knives, such as, thus cutting knives with cutting blades on the disc to form a cutting room, it is beneficial for physical

Material cutting.

By adjusting the amount of projection of the bottom blade cutter and bed knife to ensure that the gap between ε. On the opening in the housing inclined inlet port, in this

mill, the material in the cutting by the cutting blade tension <15>, so the feeding process without the feeding device to feed automatically. Also in the row

Spout with sieve, sieve mesh size of the particle size of the material according to requirements.

Examples verification in October 2009 in Beijing Daxing used as a raw material for cutting fruit tree pruning crushing test, pruning fruit trees, mainly from Daxing apple,

peach, etc. for spring fruit tree pruning, so moisture content lower than average 10% of the average diameter of between 5 ~ 8cm,

To detect mill productivity and power of the test with a diameter 10 ~ 15cm, more than 15cm branches for comparison tests.

Methods and instruments national standard reference test methods "feed mill test methods", test parameters including productivity, power consumption, noise, and crushed material

dimensions. Productivity per unit of time in which pulverized biomass feedstock volume, m3 / h; consumption using power analysis

Crushing unit time measured biomass feedstock required current, kwh/m3. The main instruments include the 3169-20 Power Analyzer, HS5633 sound level meter, SJ9-1 electronic

stopwatch, JJ1000 electronic scales, steel tape measure, thermometer.

Results and analysis in the testing process, the wood-based biomass shredders run more smoothly, work reliably, no strong vibration sense, able to meet the requirements.

2013年7月22日星期一

New category crusher device group with






Installation problems 1) Crusher mass 36t, the workshop crane of 10t, unable to meet the needs crusher installation, on-site practical need 80t crane installation. 2) equipment

base for the steel platform, steel erection quality requirements are relatively high. 3) anchor bolts required

And equipment will be installed.

Equipment installation points 1) in plant row - axis at the left channel reserved. 80t crane along the passage into the plant within. As layers platform obstruction, crusher can

be installed directly in place, now 3m edge of the platform mounting position extends a steel platform, the installation device

Into temporary platform, then use the inverted chain moves horizontally to the installation location. 2) equipment early leveling.

a of equipment given to find a positive basis, using shims or temporary horn group devices preliminary leveling, alignment work. b steel ruler to measure the elevation datum

point from the base to the device under the base surface distance, equipment installation shall meet the requirements of the drawings, requiring deviations within 5mm

. c Use the pull chalk line method measuring equipment centerline and basic vertical and horizontal centerline deviation should ensure that within 5mm. d Mobile crushing plant, grinding

equipment and other equipment to connect or convergence relations, positioning, and its positioning plane, line, or point and the plane of the baseline installation location and

elevation allow

Xu deviation should comply with: longitudinal and transverse plane position tolerance of 3mm.

e When shimming parts, such as adjusting the gap junction sliding bearings, adjusting eccentric cone crusher manufacturer and so on, to use the equipment supplied gasket; such as field

equipped with, should be exactly the same with the original gasket.

f install leveling: Longitudinal level of not more than 050/1000, the horizontal level is not greater than 020/1000, on the spindle and bearing carved surface measurements. g

stand above components should base alignment, leveling and tighten the bolts only after the assembly. h frame pre-connecting bolts

Tight power equipment shall meet the requirements of technical documentation, tighten the order should symmetric force should be uniform.

3) secondary leveling. a secondary leveling should review the equipment installation in the original elevation and centerline. b secondary leveling should be in the original

time to look for a positive reference plane carried the official horn adjusted horn placement requirements are as follows: Each bolt next to the at least one set of horns: Horn

group can

Put stability and does not affect the case of grouting, anchor bolts and base should be placed close to the main parts of the force at the bottom. Horn group into the underside

of the device base length should exceed equipment anchor bolts.

Horn set bolt center spacing from the edge of 4060mm, the bottom horn in contact with a solid foundation to achieve contact with the surface, does not warp; adjacent spacing

appropriate for the two horns 5001000mm, if more than 1000mm, then the middle of every 1000mm put a set of horns, when the bolt spacing

Less than 300mm, it would be placed on the same side of the bolt group of horn or use a jack horn. Horn face should be exposed edge of the base device 1030mm.

Paired oblique horn length of the lap length is not less than 3/4 of the wrong angle no greater than 3.c matter horn in each group, and retest equipment and equipment level

degree vertical and horizontal concentricity without changes, subject to change, re-adjust until qualified. d secondary alignment method same leveling, aligning, and symbols

Together these requirements. e level degree after passing alignment, calibration base elevation meets the requirements, in conjunction with relevant departments to promptly

check and acceptance, horn groups on both sides of the interlayer spot, cross secondary grouting.

4) water medium hydraulic coupler.

Filling range of coupler 40% of the total volume of 80% is not allowed beyond this range, but not allowed full, because filling exceeded 80% of total volume, will make couplers

in operation because of overload due to sharply boost heating , couplers internal pressure increases, causing leakage, and even cause mechanical damage

Bad. Filling the order: first tighten bet slug and unscrew the vent fusible plug for use, and in accordance with the manufacturer's instructions as provided by the amount of

injected fluid-filled inner coupler, shall be brought into any impurities; then screw on the fusible plug ; finally slowly rotate the coupler until the liquid begins to overflow

from the injection hole

So far, the time from the injection hole position foundation height, horizontally directed from a motive or protective cast, to make the reticle mark, after checking the amount

of liquid as the standard line.

Debugging a) preparation. Check all fasteners, without loosening; refueling; connect power; jog, determine the motor turning correct, two toothed rollers teeth without

collision. 2) load test. Starter motor, so that the crusher load running 1h, observe the functioning of the machine, note that there are

No abnormal noise and the impact of the phenomenon, the sealing surface reducer whether oil spills, grease pump is working properly. 3) load test. Start the motor, allow the

device to normal operation after feeding, running 1h. Then the operating handle hit the automatic position, running 2h. Observe whether the material normally broken

Broken, check the particle size to meet the requirements.

Filling search collection gangue material crushing process of entry and practice




Blanking process tape transport → → → charging big shaker screening → ballast blocks into the feed hopper → → by small vibrating screen into the crusher → Transport →

blanking tape Description: raw materials are first screened by the large vibrating screen, part of the material falling into the belt transported to the stockpile, and the

remaining bulk material into the hopper

The feeder to the small shaker by small vibrating screen into the crusher machine, the crusher fall belt stockpile.

660V and 380V power distribution using two voltage which crusher 660V, all other uses 380V, total system power is 141KW. (Power supply system diagram) 2, the device starts

running the program equipment: two belt → → small vibration crusher Screen → → large feeder vibrating screen equipment

Stop: boosted sieve → → small vibrating feeder crusher sieve → → two belt 3, the major technical problems with the pure material handling gangue stone are very different,

the main difference between the first gangue in iron, easy destruction crusher, and iron can not enter the filling material; Second gangue often by

In the rain, underground sprinkler and other reasons to become wet, causing the machine not function properly broken; Third gangue in wood, wire mesh and other production waste,

will affect the crushing and waste rock aggregate quality. Therefore gangue crusher need to solve the following three technical issues: a deal with gangue of iron

Pieces; 2, wet conditions for complete crushing plant; 3, various types of debris sorting.

Solve these three issues in order to ensure normal production and waste rock aggregate technical requirements.

For the first question, we took three measures: 1, loading links have someone to pick up early, to prevent large iron pieces such as beams, columns, rails, etc. into the system;

2, in the shaker fixed magnet, prevent large iron pieces such as iron shoes, said splint, snap ring, etc. into the break

Crusher; 3, a magnet mounted on the transport belt, such as the small pieces of iron wire, screws, etc. from the shaker magnet drain fled after the absorption of iron from the

transport belt will net; For the second question, we took two measures: 1, charging will dry material and wet material to match, ensuring broken material

Not too wet; 2, with vibrating screen primaries, the fine material directly into the belt, feed the massive coal gangue crusher; against the third question, we took two

measures: 1, in the loading, warehousing, transportation, warehousing and other sectors arrange sorting; 2, vibrating screen choose a reasonable slope

Degrees, so that the speed gangue material appropriate for staff sorting; 4, to deal with the security problems in system operation, we found that some of the factors that

affect the safety of production, we passed by taking reliable measures to prevent security incidents.

Electric shock our main measures are: 1) to do a special grounding, grounding of all equipment systems; 2) All operating voltage becomes 36V; 3) switch must be "big four"

(leakage, grounding, overcurrent, missing items) complete protection; 4) maintenance equipment must be open

Off blackout atresia; material stone splashing wounding a) All wheels must have a guard; 2) Crusher port security fortification fly belts and anti-fly chain; 3) key parts of the

staff to wear helmets and protective eyewear; electric welding time prevent fire accidents a) welding work around 15m strictly prohibited flammable

Explosives; 2) welding supply line to ensure integrity; 3) oxygen, acetylene bottles spacing maintained over 5m safe distance; 4) torch, pressure gauges, back firearms to ensure

intact; 5) to comply with the relevant safety technical operation; 3.4 Other incidents 1) do a good job in the trenches around the barricade to prevent personnel

Falls; 2) prohibited from height to throw the material; 3) into the equipment maintenance must blackouts; 4) from the magnet to take iron pieces must be parked equipment; 5) man

and forklifts to protect more than 2m safe distance; 6) Waste Dump turn When someone below the non-material; 7) forklift in reclaiming waste dump to have someone care when

; 5 Conclusion In filling aggregate production practice there are a number of issues need to be further refined and improved, such as dust and reliable measures taken to reduce

or eliminate the dust; study of high strength hammer, hammer to reduce the frequency to change or replace other forms of crusher; non-iron materials by hand sorting

And difficult to pick up to do, should be done to fill the entrance shaker screening and other problems.

2013年7月21日星期日

Broken strange situation in the control operations integration and disposal





Successful experiences (1) after taking into account the expansion transformation may cause the actual coal warehouse cone pressure than the original increase, resulting in

pulverized coal flow variation. In order to increase the pulverized coal flow and a reduction of the compressed air into the water, in December 2006 at the end of the compressed

air into the coal

Flow system to help increase the pipeline before the dryer, and strictly control the coal moisture content does not exceed 1.0%. Also in the take-off artificial beat kiln coal   Semi-mobile crushing plant

silo cone and lower pulverized coal pipeline approaches to increase the mobility of .

(2) In order to prevent coal dust "knot arch", in January 2007 in the kiln silo cone adds air guns and vibration motor. After taking these measures, the phenomenon of broken

coal significantly improved, each class usually appear 1 to 2 times, each time 3 ~ 5min.

(3) In order to solve our broken coal kiln Pfister scale problems, in late June 2007 inspect the site and analyze that frequent the real reason for breaking coal flow aid

warehouse cone gas flow aid pipeline exports blocked, while gas shortage led to a flow aid, so that poor pulverized coal under aggregation  crushing equipment

. As production heavier tasks, not emptying the silo kiln handle this, the temporary transformation of the warehouse cone gas flow aid system, to be emptied after the planned

overhaul this thoroughly kiln coal warehouse processing. Temporary modification of specific measures are: to control the air flow past the solenoid valve

Instead straight into the style of the past after a plurality of solenoid valves removed, leaving only a total, annular flow aid directly from the main channel - on the next - a

few inflatable cone hose right positions.

Use effect after a period of use, the tail scales off coal phenomenon has been basically eliminated. Thereby stabilizing the kiln thermal system, avoiding the tail scales

frequently broken coal for clinker production quality. After transformation, the tail rotor load factor trend scales.

After transformation, the tail rotor load factor trend scales preheater system 2 partial pressure, temperature suddenly showing zero earlier in the kiln system during normal

operation, C1 ~ C4 cylinder and cone shaft preheater outlet temperature, pressure, all of a sudden by the normal becomes 0, the tertiary air temperature and pressure by the same

Normal value becomes 0, many a red alarm, the control operation screen. In this case, the control operator rapidly beating the air gun and notify local pressure field inspection

personnel check flap valve abnormalities hammer lever operation is flexible.

Preheater system pressure suddenly showing zero based on past experience, (a) when the preheater system clogging phenomenon are: ① gas pressure instability: clogging over many

parts of sharply negative, blocking parts (generally in the cyclone cone part) the following will soon decline even

To positive pressure; ② rapid temperature changes: clogged suspended in the air stream greatly reduced quantity of raw, raw materials and hot air can not be effectively heat

exchange, resulting in congestion levels over part of the temperature drop cyclone, blocking part of the following various parts of the abnormal temperature rise, especially in

blocking

Plug at the next level cyclone or calciner, because there is no raw material enters the gas temperature will surge; ③ often increased: (a) coal storage space; (2) coal and coal

storage warehouse within cones appear "knot arch", "scaffolding" phenomenon that can not be normal coal out of the warehouse; (3) raw coal silo and mill

The transfer device between failure or blockage. At this point, you must promptly find the mill feed interruption and fast processing; should also be closely monitored and out

into the grinding mill air temperature, because the temperature is too high to prevent spontaneous combustion or explosion of coal dust causes the mill feeding interruption time

More than 10min

Must stop grinding. February 2011 Henan a cement plant using bituminous coal mill coal feeding occur due to interrupt a long time, the control operator is not in a timely manner

into the mill hot air valve is closed, there is no cold air into the mill will be fully open valve, the results of wind temperature up to 150 ℃, coal mill bag filter dust bag

full within

Fire department, a considerable economic loss.

Coal mill electric ear vibration tendency anomaly coal mill electric ear vibration (grinding sound) meter installed in the field through the special structure of the probe, the

mill received the noise, the shielded cable to the instrument and converted to digital decibel instructions, while the output proportional with the decibel value 4 ~ 20mA

electric

Flow signal decibel value of the fill material is inversely proportional to the mill, the grinding media and the material is proportional to the weight ratio, so it can

quantitatively measure the size of the mill load. The operator can control the level of sound under ground coal flow into the mill, mill load in order to achieve the control of

the mill output

Highest and lowest power consumption. Coal mill normal production, electric ear vibration in a small range of fluctuation (), indicating incoming uniform mill load stable, then

mill the highest yield, lowest power consumption.

Old steel lifting device driven by R & D Progress Broken Steel




Shirring equipment, mainly for handling of heavy scrap and large components, to reach a certain size and weight, ease into the furnace, then the appropriate sorting can complete

separation equipment, to achieve the purpose of removing foreign purification products; crushing equipment to handle unsorted mixed

Low-quality scrap and subsequently generally equipped with advanced magnetic separation and sorting equipment, to remove foreign material purification products as well as the

purpose of increasing the scrap heap Ratio After the above processing equipment, mainly to achieve increased density decreases and the residue purified granularity Objective To

compare the three types of scrap processing equipment, phase  coal screening machine

For scrap crushing machine for the processing of many kinds, high productivity, to remove debris, if accompanied by an appropriate sorting equipment can even mixed in the steel

scrap sorting out non-ferrous metals harmful to obtain very pure high black metal raw materials and thus, scrap crushing production line is the target

Former world light on the ideal scrap processing equipment.

Scrap crushing production line will be thin metal scrap (such as used car body) broken into small pieces to facilitate sorting, get pure black metal raw materials through scrap

crushing production line processing of scrap is clean quality scrap its natural bulk density of 1.2 1.7t/m3,  Mobile crushing plant

Is ideal for steelmaking charge in the steel smelting, has the following advantages: (1) high metal yield, ie refining molten steel scrap and increased the proportion of

investment; (2) the chemical composition of each heat stable, non-ferrous metal and non-metallic material has been sorted, so the molten steel containing parathion

Was reduced; (3) mixed with other charge when feeding, crushing material can be filled gaps, improve feeding density, thereby reducing the number of reduced electrode breakage

plus furnace, the furnace is heated evenly and prolong the refractory lining life, reduce air pollution and slag.

Scrap crushing production line process scrap crushing production line process, as shown by the flattening or packaged processed scrap raw materials, through slat conveyor

transported to the feed ramp, feed ramp rotatably mounted on one high and one low two a rolling drum to be squashed and broken to give as gifts

Inner crusher machine with a fixed disc on the spindle and a set of security can swing freely between the disc of the hammer, the kinetic energy generated by the high-speed

rotation, such as the tear drop scrap crushing treatment for the steel scrap into blocks or lumps, and through the bottom or the top of the grid,

Fall in the vibrating conveyor, automatic control and man-machine interface operation.